News from the bottom.

Friday, June 25th, 2010

I know the pixels are just cooling on Tom’s last blog update but things are moving quickly now; the results are coming in thick and fast and, I kid you not, the rain clouds are moving in.

Yesterday in the blistering Madrid heat, five of the HOUSE’s finest assembled at the team tent for the daily award ceremony; the award being Sustainability.  As usual, the awards began with an introduction by the judges, which explained how sustainability needed to be viable for the mass-market and be something people wanted to live in. Though this lifted our spirits, it has been a common observation by the judges, yet has frustratingly not translated into prizes.

Just to make things even more interesting we had a BBC film crew watching our every move, and as the judges made their commendations and our name did not come up I started to worry that their trip would have been in vain. As they moved to the main prizes, however, I started to wonder whether this time our message had made it across, and as they reached the second prize and began describing mass-marketability, closed loop food systems, affordability, and finally two stories, I realised that we were finally about to win something… and something important.  Next thing I know, we’re lifting a trophy in front of cameras and the rest of the Decathletes!  

Through the competition I had almost forgotten about sustainability; we had been sure of winning Market viability and hopeful of Architecture, but had forgotten that it was Sustainabillity that we were really here to win; after all, who needs to win Market Viability when we have a cheap house that everyone says they want to live in; who needs to win Architecture when the people that would live in it love the spaces. We were gradually becoming happy to just win the hearts of the public, but to be awarded this prize means a lot… and gives us another trophy to display alongside our Timber at Ecobuild Award!

Ben

The Eurovision effect.

Friday, June 25th, 2010

Ladies and gentlemern,

Once again I must begin with one of my patented “Oh what a busy life I lead!” apologies. As I’m sure you can imagine, day-to-day activities at the Solar Decathlon Europe are fairly hectic, and me sitting down and typing merrily away on the laptop when there are visitors to be shown around the H.O.U.S.E would not be taken to kindly. Currently, however, it is siesta time in Madrid, and I’ll take this chance to update you all.

I don’t want to talk too much about the competition, actually, as if you’ve been following the results you’ll know they are not exactly in Nottingham’s favour. This is obviously sorely disappointing to everyone on the team, especially having received little merit in the categories the H.O.U.S.E was specficially designed to win – Industrialisation & Market Viability, for one; and Architecture too, which was stipulated as calling for cheapness, urban density and innovative use of exisiting materials in the design – all key aspects of our proposal. Also gutting was losing out in the Communications awards, which after our large internet and media presence we were confident of high marks in.

But enough comiseration. Even as our team climbs gradually up the leaderboard now that we have our daily water and electric tests fully underway, we can be confident that the H.O.U.S.E has been succesful in its own aims – that the public unanimously agree that our H.O.U.S.E is in fact a comfortable and welcoming home, which they would be both happy to live in and proud to promote its self-sustainable credentials. And that, for us, is what this project has been about – changing people’s perspectives on environmentally conscious housing.

We’ve had some other great times on site too. On Monday evening, we had the honour of hosting VIPs from both the embassy and the Saint Gobain team. With trays of champagne and canapés, and kind words from all parties including our own Mark Gillot, the student body of the team had a chance to relax a little and enjoy the congratulations for the phenomenal work they’d put in to be there.

Tuesday night saw myself and Lucia Milone host the first of our two meals in the H.O.U.S.E this week. Treating guests from teams Grenoble and Berlin to Sat’s delicious menu (hopefully done justice…) and some classic English company, we had the chance to meet these Decathletes in a non-competitive setting, which was refreshing. Conversations in broken English flowed easily over the solar-oven-cooked tomatoes and fantastic slow-cooked pork, and the H.O.U.S.E felt very much like a home as we all revelled in what we were part of.

But last night the real competition took place – the Solar Decathlon World Cup! Meeting on a dusty astroturf a little way from the Villa Solar, fresh from England’s victory in South Africa, a rough and ready team of Nottingham Decathletes assembled to face the challenge from Team Seville. We put up an extremely good fight in what was a very close match, but we couldn’t quite hold back the home side, who finished with a late goal to clinch it 4-3.

…and that’s about it! Tonight, Emily Costain and Chris Dalton serve dinner for more esteemed guests, and we continue to compete in the trials until Sunday. Wish us luck!

Tom

The show must go on!

Tuesday, June 22nd, 2010

I’m currently sat under the pergola of the Nottingham H.O.U.S.E plot with the infamous Ben Hopkins, revelling in our storming performance during the first three jury interviews – Architecture, Industrialisation & Market Viability, and Communications – which finished but seconds ago!

I personally believe that of all the 10 competitions in which we are currently taking place, these are three in which we have a very strong chance. In terms of market viability, the H.O.U.S.E is second to none – despite the prestige of the event, the Solar Decathlon is but a chapter in the project’s story, the next being a move towards making the build a readily-available and mass-produced product, and the ultimate aim being to alter the minds of the British public regarding sustainable housing.

The architectural jury were blown away with Ben, Chris and Rachael’s brilliantly innovative use of existing – and affordable – materials and technologies in the design, creating the comfort of a home with the credentials of future architecture.

And without blowing anyone’s trumpet, I think that even without events like Ecobuild an dSat Bain’s Masterclass, the Communications team have done an absolutely stellar job of promoting the H.O.U.S.E in the run-up to the competition, and again the jury seemed extremely impressed with how we were telling this story on the Villa Solar.

So in short, a hugely encouraging start to the trials. On with the show!

Tom

Here comes the Sun.

Tuesday, June 22nd, 2010

A very quick one from the site in Madrid…

The last few days have been tough on everyone – both those in Decathlete Teams A and B, who have not stopped since arriving on the 5th, and Team C, who are doing their best to be fresh legs but are already finding the hours debilitating. The days we lost to flooding on site have cost us dearly, but the amount of effort that every member of the H.O.U.S.E team has put in to compensate is truly commendable.

The good news is this – the H.O.U.S.E is standing, the planters are planted, the build is hooked up to the power, I’ve seen the Passive Downdraft Evaporative Cooling system working with my own eyes, the rooms are fully furnished, and really the only jobs remaining involve dotting i’s, crossing t’s and putting final coats of  paint on everything. After that, a quick sweep round and we open up the site to the public – scheduled for 4 o’clock today (local time), with tours at 6. Thus begins the competition!

We might even be able to sneak away and watch the England game after the visitors go home…

Tom

The rain in Spain… oh, you know this one by now.

Wednesday, June 16th, 2010

Less than 24 hours to go before myself and the other members of Decathlete Team C leave for Madrid, but it’s still too long! If you’ve been keeping abreast of the goings on on the Villa Solar through the brilliant Mr Blue, the H.O.U.S.E Facebook page, or through the blog and gallery on the Solar Decathlon page itself, then hopefully you’ll understand why I’m so keen to be out there!

From the sounds of things, the H.O.U.S.E itself assembled like an absolute dream – obviously our main concern, and a huge relief for all that we could clear such a major hurdle. No instead, the trickiest part of this initial construction period has of all things been the inclement weather! Despite packing bags full of shorts and tees to survive the expected sub-Saharan heat, the Decathletes have been hounded by the torrential rain on site.

Kindly, the Solar Decathlon organisers have offered both more time and expert help to the H.O.U.S.E team, to ensure the site – and the build itself – are safe and stable. And without jinxing anything, the weather looks to be on the turn for the better too… so fingers crossed all teams get to use their solar technologies to full potential once the competition starts in a few days!

For now, back to packing… see you on the other side!

Tom

English epilogues and Spanish salutations.

Friday, June 11th, 2010

Dear Readers,

It’s been almost a week since we packed, loaded and waved a teary farewell to the lorries carrying our precious modules, as well as the trucks full of planters, plants and other materials that make up the exhibition landscape of our site at the Solar Decathlon. What’s more, in less than a week we members of Decathlete Team C will join the H.O.U.S.E.  - by then fully assembled – in Madrid for the public stage of the competition.

We haven’t been slacking this past week, though - the dust clouds left in the wake of the H.O.U.S.E. left all members of the team remaining in Nottingham with many tasks to undertake, including industrial-level clean-ups and preparations for exhibitions in the uni’s Department of the Built Environment itself. The build may have departed our shores, but this is not quite over yet.

The hardest work, of course, has been for Decathlete Teams A and B, who arrived on the Villa Solar site on Saturday and have been in full construction mode ever since. Having levelled the site, the first trucks arrived on Monday with the aforementioned landscaping paraphernalia, and the modules themselves arrived yesterday – their triumphant entrance dampened only slightly by the torrential rain it seems the whole of Europe is experiencing right now.

The Facebook site is being regularly updated with pictures straight from the event, so direct yourself there for the latest shots. Also present on-site is Mr Blue, keeping us abreast of the goings-on through his tweets, and his family Ms Green and Kid Orange will be travelling out with Team C next week, so there’s no need to feel out of the loop.

For now, back to finalising our tour plan for presenting the H.O.U.S.E. in the competition!

Tom

Sprint finish

Thursday, June 3rd, 2010

All

Days have dissolved into vital hours as we approach the last moments of the Nottingham-based stage of this project. Whilst we’re nowhere near the mad rush we were before we shipped out to ECOBuild, all hands are on deck and the words “priority” and “essential” are becoming somewhat overused.

What I find most funny is the way in which these priorities have changed almost week on week. No longer are we concerned with “trivial” things like insulation, or the Rigidur boards of the walls that took up so much of our time mere weeks ago. Instead we find ourselves focussed now on the details of the design – the architraves and skirting, the cover strips on the walls and ceilings, and the connections between the modules.

But of course, it goes without saying that without those core components of wood and Isover products, we would not have a structure to detail. It says a lot that without thinking, we now consider the H.O.U.S.E. as a solid entity with roofs and walls – rather than the timber cassettes which arrived in KMC so long ago.

And it is this solid entity that we are now preparing for travel. All non-structural work has been called to a halt as we ready to wrap the modules, following the very lunch break we Decathletes are taking now on site, and we await the arrival of the flatbed lorries and 50-tonne crane tomorrow morning!

Peace out.

Tom